Thursday, October 15, 2020

Sharing session 16/10

 #Letterbox

-Note circulation to avoid dead end

-note recess underneath for handicap, min 230mm

-clear space between 2 back to back to be min 1200mm. as it is term as " secondary access"

#Sunken Planter

- so as not to block view, as raised planter, will have raised railing

-but note if sunken, soil has to be enough to plant .

#Lift Lobby

-Height max 3m? by TMArch? as services above head, vendor has feedback that need to have ladder to reach.

-*Telecom cable tray routing, services needs to be firmed up early, so as to avoid routing through lift lobby. If services, "services running though corridor to be in fire-rated board"

-As even if design allows for high void, if this is not taken care, lobby height has to be low, here is 2600mm.

-note size of tiles above head, more than 2.4m, no need tiles?

-Lift Motor-room if present, then last 2 floors don't need to have E&I & TMS detail.

#Self-Tapping screws vs Self drilling

-self drilling needs a pre-drilled hole

-note for self tapping, suitable depth of bit is dependent on thickness of material to drill through.

-self tapping screw

-Entirely done off-site is best: As this increases productivity, and with less people on site, less to safeguard

#Accessible Toilet

-2x2m clear so that it includes tile thickness

-note critical dimension of 750mm, rigel has a 750mm, note behind it needs a space for cistern

-note basin needs to have enough depth for leg space

-clear space outside 1.2m, if no accessible wc inside

#Lower roof (note RVO..penalty)?

-"lower roof slab ends at corridor, solution was to add a roof gutter". extend floor edge for rwdp

-key issue is how to address "roof gutter" at lower roof.

-note when u say floor edge-->parapet

-aircon ledge has a vent pipe. note location of this may overlap with location of gondolo stumps.

##Perspective##:

-If its done wrongly, so what?

-whose responsibility is it?