 started w doing construction drawings, for an existing project. a cafe layout, plans. adding gridlines. Actually it is not difficult, but not sure why i couldn't get it right.

*Post Exercise Cabinetry*

-Gridlines to be lighter, and always dimension

-Panel lines, no extra frame, note panel to be in front of structural frame

-no overlap lines

-drawer detail, back board with drawer container detached from it, and intermediate member between the front pulls. note overlap region necessary to prevent drawer from sliding backwards

*Post Exercise larger factory*

-Annotation, label ingress/egress, indicate building line above, mezzanine above, dimension of FEA

-possible for 

1)CSR to be on top of transformer & Powergrid on top of CamberChamber, but total ht would be 5.7m

-for vehicles, that are 3.0x7.5m 90 degrees reverse parking,  would need 9.0m distance behind

-lorry min clear clear height 4.2m

-generic column size 800x800

-aircon ledge is $, always aim to have min 5% of min 150sqm

-GFA efficiency good value is 70-80% and Saleable efficiency is 120-140%

-"Ancillary office": is mezzanine floor and 

-"Other Ancillary": M&E ( only rooms), lift lobby, staircase, FCC

-note mezzanine floor above 24m need to have driveway access but then efficiency will drop because of added liftlobby

Sunday, November 8, 2020

New team feasi

Factory feasi

good to have:

-Ramp at 1:9

-calculate efficiency of building

-beyond 24m, cannot have mezzanine

E must have:

AC ledge to be 5% of area

E ideas:

-corridor linking to lobby, open to sky, possible to be gfa free

-"canteen" as a "fine dining space"

-sky terrace: difficulty in how to make it common

-setback from boundary line for putting sub structure and formwork; how to plaster and paint?

Comments upon looking at feasi

-FEA along external roads, have to be after drain and pavement

*note discussion w C&V, proximity of industrial stairs to be FEA does not need to  be 18m, vs residential stairs that needs to be. If sprinkled, 50% of building can have indirect discharge, but has to be 5m from building eaves.


1 month break

 was just trying to find how long before this pause. has it been 12 years? fukushima is 10 years. i prepared some lunch boxes. teared a bit....