Factory feasi
good to have:
-Ramp at 1:9
-calculate efficiency of building
-beyond 24m, cannot have mezzanine
E must have:
AC ledge to be 5% of area
E ideas:
-corridor linking to lobby, open to sky, possible to be gfa free
-"canteen" as a "fine dining space"
-sky terrace: difficulty in how to make it common
-setback from boundary line for putting sub structure and formwork; how to plaster and paint?
Comments upon looking at feasi
-FEA along external roads, have to be after drain and pavement
*note discussion w C&V, proximity of industrial stairs to be FEA does not need to be 18m, vs residential stairs that needs to be. If sprinkled, 50% of building can have indirect discharge, but has to be 5m from building eaves.