Showing posts with label #efficiency. Show all posts
Showing posts with label #efficiency. Show all posts

Monday, November 30, 2020

New Team

 started w doing construction drawings, for an existing project. a cafe layout, plans. adding gridlines. Actually it is not difficult, but not sure why i couldn't get it right.

*Post Exercise Cabinetry*

-Gridlines to be lighter, and always dimension

-Panel lines, no extra frame, note panel to be in front of structural frame

-no overlap lines

-drawer detail, back board with drawer container detached from it, and intermediate member between the front pulls. note overlap region necessary to prevent drawer from sliding backwards

*Post Exercise larger factory*

-Annotation, label ingress/egress, indicate building line above, mezzanine above, dimension of FEA

-possible for 

1)CSR to be on top of transformer & Powergrid on top of CamberChamber, but total ht would be 5.7m

-for vehicles, that are 3.0x7.5m 90 degrees reverse parking,  would need 9.0m distance behind

-lorry min clear clear height 4.2m

-generic column size 800x800

-aircon ledge is $, always aim to have min 5% of min 150sqm

-GFA efficiency good value is 70-80% and Saleable efficiency is 120-140%

-"Ancillary office": is mezzanine floor and 

-"Other Ancillary": M&E ( only rooms), lift lobby, staircase, FCC

-note mezzanine floor above 24m need to have driveway access but then efficiency will drop because of added liftlobby

1 month break

 was just trying to find how long before this pause. has it been 12 years? fukushima is 10 years. i prepared some lunch boxes. teared a bit....