started w doing construction drawings, for an existing project. a cafe layout, plans. adding gridlines. Actually it is not difficult, but not sure why i couldn't get it right.
*Post Exercise Cabinetry*
-Gridlines to be lighter, and always dimension
-Panel lines, no extra frame, note panel to be in front of structural frame
-no overlap lines
-drawer detail, back board with drawer container detached from it, and intermediate member between the front pulls. note overlap region necessary to prevent drawer from sliding backwards
*Post Exercise larger factory*
-Annotation, label ingress/egress, indicate building line above, mezzanine above, dimension of FEA
-possible for
1)CSR to be on top of transformer & Powergrid on top of CamberChamber, but total ht would be 5.7m
-for vehicles, that are 3.0x7.5m 90 degrees reverse parking, would need 9.0m distance behind
-lorry min clear clear height 4.2m
-generic column size 800x800
-aircon ledge is $, always aim to have min 5% of min 150sqm
-GFA efficiency good value is 70-80% and Saleable efficiency is 120-140%
-"Ancillary office": is mezzanine floor and
-"Other Ancillary": M&E ( only rooms), lift lobby, staircase, FCC
-note mezzanine floor above 24m need to have driveway access but then efficiency will drop because of added liftlobby